The lot is cleared. The drawings are close.
This is a familiar moment in a Pacific Palisades fire rebuild.
Three bids sit on the table. One is noticeably lower.
It’s tempting. Before you sign, read what it leaves out.

Mistake 01 · The bid
Choosing the lowest bid without reading the exclusions.
A low number with a long exclusion list isn’t cheaper. It’s incomplete.
It doesn’t make that builder easier to work with, either.
The gap usually comes back later, as change orders.

Mistake 02 · The plans
Pricing the house before the plans are finished.
An unfinished set gets an unfinished price.
Finish the drawings, then compare.

Mistake 03 · The order
Ordering windows and cabinetry too late.
Both can take months to make.
Our cabinetry and millwork are made in our own shops, so we plan them early.
A low number with a long exclusion list isn’t cheaper. It’s incomplete.
Sometimes a complete price loses to one that left things out

Mistake 04 · The allowances
Trusting allowances that were set too low.
An allowance holds a place for a finish you haven’t chosen yet.
Set it low, and the whole bid looks lower.
The difference shows up the day you pick the tile.

Mistake 05 · The scope
Comparing totals instead of line by line.
Survey, soils, structural engineering and utilities are real scope on a Palisades lot.
If a bid never mentions them, ask where they went.
Compare what’s included, not just the total.

Mistake 06 · The code
Leaving the wildfire code out of a Pacific Palisades fire rebuild price.
Since January 1, 2026, the rules sit in California’s Wildland-Urban Interface Code.
We explain the 2026 wildfire code in more detail.
Class A roofs. Ember-resistant vents. Tempered, dual-pane glass. Enclosed eaves.
Price them on day one, not after plan check.

Mistake 07 · The schedule
Signing without a schedule.
A number without a schedule is half an answer.
Our current Palisades project timeline is 12 to 14 months. Yours could be sooner or longer, depending on your plans.
Every client gets a private portal with weekly photo updates.

How we approach it
The builder belongs at the table early.
We build from your architect’s or designer’s plans. Or we’ll recommend one we trust.
We price the house with them, while the drawings are still moving.
You see what’s included, what isn’t, and every allowance.
And you always know where your home stands.
We also wrote a step-by-step look at Palisades recovery.
A complete price can look higher on paper. Read the whole bid.
Common questions
Questions about a Pacific Palisades fire rebuild.
A few questions we hear on almost every Palisades lot.
None of them are about design.
They are about price, timing, code, and who sits at the table.
How long does a Pacific Palisades fire rebuild take?
Our current Palisades project is taking 12 to 14 months.
Yours could be sooner or longer, depending on your plans.
A number without a schedule is half an answer.
Ask for a schedule before you sign.
We’ll review your plans for a realistic timeline.
Every client gets a private portal with weekly photo updates.
What does the wildfire code require?
The California Wildland-Urban Interface Code, or CWUIC, took effect January 1, 2026.
It calls for Class A roofs and ember-resistant vents.
It also requires tempered, dual-pane glass and enclosed eaves.
Price this work in the first bid, not later.
We explain the 2026 wildfire code in more detail.
The official listing is on the California Building Standards Commission codes page.
Can I use my own architect or designer?
Yes. We build from your architect’s or designer’s plans.
Or we’ll recommend one we trust.
The builder belongs at the table early, with them.
We price the house with them, while the drawings are still moving.
You see what’s included, what isn’t, and every allowance.
And you always know where your home stands.
Should I pick the lowest bid?
A low bid with a long exclusion list isn’t cheaper.
It’s incomplete.
It doesn’t make that builder easier to work with, either.
Compare what’s included, line by line.
Survey, soils, structural engineering and utilities are real scope.
If a bid never mentions them, ask where they went.
An allowance holds a place for a finish you haven’t chosen yet.
Set it low, and the whole bid looks lower.
The difference shows up the day you pick the tile.
A complete price can look higher on paper.
Read the whole bid, not just the total.
The gap usually comes back later, as change orders.
When should windows and cabinetry be ordered?
Order them early. Both can take months to make.
Our cabinetry and millwork are made in our own shops.
We plan them early so they don’t hold up the job.
Don’t leave this order until late in the job.
Both should be in the first plan, not a later surprise.
When should the builder join the process?
The builder belongs at the table early.
We build from your architect’s or designer’s plans.
Or we’ll recommend one we trust.
We price the house with them, while the drawings are still moving.
An unfinished set gets an unfinished price.
Finish the drawings, then compare.
Your rebuild
Send us your plans. We’ll give you a realistic timeline.
A complimentary review, with no pressure and no obligation.